Pin the inputs at the Garda car fix, z-fighting, roof collision and far view #5

Closed
sailorswag wants to merge 1 commit from sailorswag/gta3-wexford-build:pin-farview into main
Contributor

Moves inputs.lock to today's commits. No build step changes: the new parts run inside the existing steps.

  • Garda car (re3-wexford b92739dc, re3-church 25293b2): it had no drive and no wheels, because re3 still took model 159 for Vice City's Sparrow helicopter. The Vice City leftover IDs are moved off the mod's models, and the car is now a GTA III-style Yaris with real wheel arches.
  • Z-fighting and collision (re3-church e71b3b2): roofs where they meet walls, terrace chimney stacks and roofs, rocks, plus a build pass that separates any coplanar faces still left. Collision is added on gables, stacks, dormers, hipped roofs, boulders, trailer wheels and Wexford Bridge.
  • Far view (re3-church e71b3b2, re3-wexford 6abdfc38): low-detail LODs per ground tile, and in the Wexford region a far clip and sea that reach about 16 km at the top draw distance.

The map build is about 3 minutes longer, for the separation pass.

🤖 Generated with Claude Code

Moves `inputs.lock` to today's commits. No build step changes: the new parts run inside the existing steps. - **Garda car** (re3-wexford `b92739dc`, re3-church `25293b2`): it had no drive and no wheels, because re3 still took model 159 for Vice City's Sparrow helicopter. The Vice City leftover IDs are moved off the mod's models, and the car is now a GTA III-style Yaris with real wheel arches. - **Z-fighting and collision** (re3-church `e71b3b2`): roofs where they meet walls, terrace chimney stacks and roofs, rocks, plus a build pass that separates any coplanar faces still left. Collision is added on gables, stacks, dormers, hipped roofs, boulders, trailer wheels and Wexford Bridge. - **Far view** (re3-church `e71b3b2`, re3-wexford `6abdfc38`): low-detail LODs per ground tile, and in the Wexford region a far clip and sea that reach about 16 km at the top draw distance. The map build is about 3 minutes longer, for the separation pass. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
Owner

You do not need to do this. update_inputs.sh is already ran as part of a release.

You do not need to do this. `update_inputs.sh` is already ran as part of a release.
joe closed this pull request 2026-10-19 09:53:06 +01:00

Pull request closed

Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
joe/gta3-wexford-build!5
No description provided.